{"schema":"plot.claim/v1","address":{"kind":"claim","id":"1A07-S3","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/1A07-S3","formats":{"html":"https://www.plot.eco/c/1A07-S3","json":"https://www.plot.eco/c/1A07-S3.json","md":"https://www.plot.eco/c/1A07-S3.md","embed":"https://www.plot.eco/c/1A07-S3/embed"}},"record_type":"observation","statement":"NEXTDC's half-year results release said M3's total planned capacity was upgraded from 200 MW to 225 MW.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Planned IT capacity (whole site)","value":{"text":"225 MW","number":225,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"design_target","kind_label":"Target (not achieved performance)","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2025-07-01 to 2025-12-31","start":"2025-07-01","end":"2025-12-31"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"target","method":"The company's half-year results release","uncertainty":null,"limitations":"A planned design figure, not power drawn or built. Company-reported.","explanation":null,"source":{"title":"1H26 Record Results (ASX release, 25 February 2026)","publisher":"NEXTDC Limited","url":"https://announcements.asx.com.au/asxpdf/20260225/pdf/06wrhk4xg0qv34.pdf","locator":"Development activity (p. 2)","page":2,"plot_url":"https://www.plot.eco/s/C3BW-F7?snippet=71fbe44a-b882-45bf-8d27-bbfb00b99185"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/1A07-S3 v1, NEXTDC Limited (2025-07-01 to 2025-12-31), target (not achieved performance)"}