# NEXTDC's half-year results release said M3's total planned capacity was upgraded from 200 MW to 225 MW.

> Cite as: PLOT record c/1A07-S3 v1, NEXTDC Limited (2025-07-01 to 2025-12-31), target (not achieved performance)

- **Address:** c/1A07-S3, version 1 of 1 (https://www.plot.eco/c/1A07-S3)
- **Value:** 225 MW (Planned IT capacity (whole site))
- **About:** NEXTDC M3 · West Footscray
- **Kind:** Target (not achieved performance)
- **Who said it:** Reported by the operator
- **Period:** 2025-07-01 to 2025-12-31
- **Checked:** Reviewed (step 3 of 4): PLOT checked the claim against its source. This is not independent verification. Checked by a person.
- **Open questions:** None open
- **Source:** 1H26 Record Results (ASX release, 25 February 2026) (NEXTDC Limited), p. 2, Development activity (p. 2) <https://announcements.asx.com.au/asxpdf/20260225/pdf/06wrhk4xg0qv34.pdf>
- **The snippet in PLOT:** <https://www.plot.eco/s/C3BW-F7?snippet=71fbe44a-b882-45bf-8d27-bbfb00b99185>
- **How they know:** The company's half-year results release
- **Limitations:** A planned design figure, not power drawn or built. Company-reported.
- **Editions:** october-26th-release
- **How we found this:** not recorded

## History
- Version 1 (this version): first published version

---
Machine-readable: https://www.plot.eco/c/1A07-S3.json
Cite as: PLOT record c/1A07-S3 v1, NEXTDC Limited (2025-07-01 to 2025-12-31), target (not achieved performance)