NEXTDC said 42 MW of additional built capacity was added at M3 during FY26.
42 MW Built IT capacity added in the period
- Kind
- Reported by source
- Who said it
- Reported by the operator
- Period
- 2025-07-01 to 2026-06-30
- Checked
- Reviewed (step 3 of 4): PLOT checked the claim against its source. This is not independent verification. Checked by a person.
- Open questions
- None open
Cite as: PLOT record c/EWXK-SG v1, NEXTDC Limited (2025-07-01 to 2026-06-30), reported by source