NEXTDC said 42 MW of additional built capacity was added at M3 during FY26.

42 MW Built IT capacity added in the period

Kind
Reported by source
Who said it
Reported by the operator
Period
2025-07-01 to 2026-06-30
Checked
Reviewed (step 3 of 4): PLOT checked the claim against its source. This is not independent verification. Checked by a person.
Open questions
None open
Cite as: PLOT record c/EWXK-SG v1, NEXTDC Limited (2025-07-01 to 2026-06-30), reported by source