{"schema":"plot.entity/v1","address":{"kind":"entity","id":"994H-VK","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/e/994H-VK","formats":{"html":"https://www.plot.eco/e/994H-VK","json":"https://www.plot.eco/e/994H-VK.json","md":"https://www.plot.eco/e/994H-VK.md","embed":"https://www.plot.eco/e/994H-VK/embed"}},"id":"994H-VK","name":"NEXTDC M3 · West Footscray","entity_kind":"facility","scientific_name":null,"summary":null,"caveats":{"kind":"facility_summary","kind_label":"Facility summary (compiled from the published claims listed)","origin":"plot_compiled","origin_label":"Compiled by PLOT from the published claims listed","period":{"text":"2021-08-12 to 2026-06-30","start":"2021-08-12","end":"2026-06-30"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"Its least-checked claim is reviewed. PLOT checked the claim against its source. This is not independent verification."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"claims":[{"schema":"plot.claim/v1","address":{"kind":"claim","id":"X12T-AK","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/X12T-AK","formats":{"html":"https://www.plot.eco/c/X12T-AK","json":"https://www.plot.eco/c/X12T-AK.json","md":"https://www.plot.eco/c/X12T-AK.md","embed":"https://www.plot.eco/c/X12T-AK/embed"}},"record_type":"relationship","statement":"NEXTDC presents M3 Melbourne in West Footscray as one of its data centres.","about":{"id":"7QF8-SV","name":"NEXTDC Limited","kind":"company","url":"https://www.plot.eco/e/nextdc","place":null},"object":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","url":"https://www.plot.eco/e/994H-VK"},"measure":"operates","value":null,"caveats":{"kind":"reported_association","kind_label":"Reported association","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"undated","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":null,"method":null,"uncertainty":null,"limitations":null,"explanation":"Proposed as source asserted.","source":{"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","locator":"Page introduction","page":null,"plot_url":"https://www.plot.eco/s/VND3-CR?snippet=d7930ed4-fc70-4c3f-a2b9-2f70e38fccf3"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/X12T-AK v1, NEXTDC (undated), reported association"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"511Z-VC","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/511Z-VC","formats":{"html":"https://www.plot.eco/c/511Z-VC","json":"https://www.plot.eco/c/511Z-VC.json","md":"https://www.plot.eco/c/511Z-VC.md","embed":"https://www.plot.eco/c/511Z-VC/embed"}},"record_type":"observation","statement":"In August 2021 NEXTDC said the full M3 site, 100,000 square metres, would target 150 MW of critical capacity at full fit-out.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Planned critical IT capacity at full fit-out","value":{"text":"150 MW","number":150,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"design_target","kind_label":"Target (not achieved performance)","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"? to 2021-08-12","start":null,"end":"2021-08-12"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"target","method":"The company's own news release","uncertainty":null,"limitations":"A 2021 plan; the operator now advertises 225 MW (already on PLOT). Company-reported.","explanation":null,"source":{"title":"It's all systems go Victoria: NEXTDC unveils plans for 150MW hyperscale campus in Melbourne's west","publisher":"NEXTDC Ltd","url":"https://www.nextdc.com/news/its-all-systems-go-victoria-nextdc-unveils-plans-150mw-hyperscale-campus-melbournes-west","locator":"News release, 12 Aug 2021","page":null,"plot_url":"https://www.plot.eco/s/B29Z-J1?snippet=c1962767-d404-4863-8e07-6449ddb61df1"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/511Z-VC v1, NEXTDC Ltd (? to 2021-08-12), target (not achieved performance)"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"YK9M-CC","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/YK9M-CC","formats":{"html":"https://www.plot.eco/c/YK9M-CC","json":"https://www.plot.eco/c/YK9M-CC.json","md":"https://www.plot.eco/c/YK9M-CC.md","embed":"https://www.plot.eco/c/YK9M-CC/embed"}},"record_type":"observation","statement":"In August 2021 NEXTDC's chief executive, Craig Scroggie, called West Footscray an emerging digital hub when NEXTDC announced its upgraded M3 plans.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Stated position","value":{"text":"Operator's public statement","number":null,"lower":null,"upper":null,"comparator":"not_applicable","unit":null},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2021-08-12 to 2021-08-12","start":"2021-08-12","end":"2021-08-12"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The company's own news page","uncertainty":null,"limitations":"A promotional statement by the operator, attributed to its CEO.","explanation":null,"source":{"title":"It's all systems go Victoria: NEXTDC unveils plans for 150MW hyperscale campus in Melbourne's west","publisher":"NEXTDC Ltd","url":"https://www.nextdc.com/news/its-all-systems-go-victoria-nextdc-unveils-plans-150mw-hyperscale-campus-melbournes-west","locator":"News release","page":1,"plot_url":"https://www.plot.eco/s/B29Z-J1?snippet=92a34ca4-8e27-4182-a3ae-b34328ca8652"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/YK9M-CC v1, NEXTDC Ltd (2021-08-12 to 2021-08-12), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"GEN9-S7","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/GEN9-S7","formats":{"html":"https://www.plot.eco/c/GEN9-S7","json":"https://www.plot.eco/c/GEN9-S7.json","md":"https://www.plot.eco/c/GEN9-S7.md","embed":"https://www.plot.eco/c/GEN9-S7/embed"}},"record_type":"observation","statement":"NEXTDC gives M3 Melbourne's address as 25 Indwe Street, West Footscray VIC 3012.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Site address (as the operator states it)","value":{"text":"25 Indwe Street, West Footscray VIC 3012","number":null,"lower":null,"upper":null,"comparator":"not_applicable","unit":null},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"FY26 ESG report, published August 2026","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"current_period","method":"The company's list of its data centres","uncertainty":null,"limitations":"Company-stated; not yet matched to a land title, planning permit or regulator record.","explanation":null,"source":{"title":"NEXTDC Limited FY26 Environmental, Social & Governance Report","publisher":"NEXTDC Limited","url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Environmental%2c%20Social%20%26%20Governance%20Report.pdf","locator":"Our data centres and Traditional Custodians (p. 2)","page":2,"plot_url":"https://www.plot.eco/s/T7WJ-MS?snippet=0f2a73e0-da04-4a7f-8764-80059f08786e"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/GEN9-S7 v1, NEXTDC Limited (FY26 ESG report, published August 2026), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"1HAP-GB","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/1HAP-GB","formats":{"html":"https://www.plot.eco/c/1HAP-GB","json":"https://www.plot.eco/c/1HAP-GB.json","md":"https://www.plot.eco/c/1HAP-GB.md","embed":"https://www.plot.eco/c/1HAP-GB/embed"}},"record_type":"observation","statement":"NEXTDC reports a cumulative 94.7% diversion of M3's construction waste from landfill since tracking began in October 2024.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Construction waste diverted from landfill","value":{"text":"94.7 %","number":94.7,"lower":null,"upper":null,"comparator":"=","unit":"%"},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2024-10-01 to 2026-06-30","start":"2024-10-01","end":"2026-06-30"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The construction project's waste tracking","uncertainty":null,"limitations":"Company-reported; construction waste only, not operations.","explanation":null,"source":{"title":"NEXTDC Limited FY26 Environmental, Social & Governance Report","publisher":"NEXTDC Limited","url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Environmental%2c%20Social%20%26%20Governance%20Report.pdf","locator":"Waste and circularity (p. 28)","page":28,"plot_url":"https://www.plot.eco/s/T7WJ-MS?snippet=7292d3b2-7e31-445e-92c9-22ce5eccec4d"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/1HAP-GB v1, NEXTDC Limited (2024-10-01 to 2026-06-30), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"JAC6-WB","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/JAC6-WB","formats":{"html":"https://www.plot.eco/c/JAC6-WB","json":"https://www.plot.eco/c/JAC6-WB.json","md":"https://www.plot.eco/c/JAC6-WB.md","embed":"https://www.plot.eco/c/JAC6-WB/embed"}},"record_type":"observation","statement":"NEXTDC said 165 MW at M3 continued to be progressed at 30 June 2026.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"IT capacity in progress","value":{"text":"165 MW","number":165,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2026-06-30 to 2026-06-30","start":"2026-06-30","end":"2026-06-30"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The company's full-year results release","uncertainty":null,"limitations":"Company-reported. 'Progressed' is the company's word.","explanation":null,"source":{"title":"FY26 Record Results and Record FY27 Growth Guidance (ASX release, 27 August 2026)","publisher":"NEXTDC Limited","url":"https://announcements.asx.com.au/asxpdf/20260827/pdf/073c04gt4ts40y.pdf","locator":"Development activity (p. 2)","page":2,"plot_url":"https://www.plot.eco/s/NFYF-8G?snippet=d0ae966d-2c12-4dea-9822-ebffe69f599b"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/JAC6-WB v1, NEXTDC Limited (2026-06-30 to 2026-06-30), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"H5MT-JW","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/H5MT-JW","formats":{"html":"https://www.plot.eco/c/H5MT-JW","json":"https://www.plot.eco/c/H5MT-JW.json","md":"https://www.plot.eco/c/H5MT-JW.md","embed":"https://www.plot.eco/c/H5MT-JW/embed"}},"record_type":"observation","statement":"NEXTDC said 185 MW at M3 continued to be progressed at 31 December 2025.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"IT capacity in progress","value":{"text":"185 MW","number":185,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2025-12-31 to 2025-12-31","start":"2025-12-31","end":"2025-12-31"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The company's half-year results release","uncertainty":null,"limitations":"Company-reported. 'Progressed' is the company's word; it doesn't say how far each part has got.","explanation":null,"source":{"title":"1H26 Record Results (ASX release, 25 February 2026)","publisher":"NEXTDC Limited","url":"https://announcements.asx.com.au/asxpdf/20260225/pdf/06wrhk4xg0qv34.pdf","locator":"Development activity (p. 2)","page":2,"plot_url":"https://www.plot.eco/s/C3BW-F7?snippet=bb18e636-b369-4d9b-885d-543cdf9a578e"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/H5MT-JW v1, NEXTDC Limited (2025-12-31 to 2025-12-31), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"EWXK-SG","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/EWXK-SG","formats":{"html":"https://www.plot.eco/c/EWXK-SG","json":"https://www.plot.eco/c/EWXK-SG.json","md":"https://www.plot.eco/c/EWXK-SG.md","embed":"https://www.plot.eco/c/EWXK-SG/embed"}},"record_type":"observation","statement":"NEXTDC said 42 MW of additional built capacity was added at M3 during FY26.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Built IT capacity added in the period","value":{"text":"42 MW","number":42,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2025-07-01 to 2026-06-30","start":"2025-07-01","end":"2026-06-30"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The company's full-year results release","uncertainty":null,"limitations":"Capacity added in the year, not M3's total built capacity, which neither release states. Company-reported.","explanation":null,"source":{"title":"FY26 Record Results and Record FY27 Growth Guidance (ASX release, 27 August 2026)","publisher":"NEXTDC Limited","url":"https://announcements.asx.com.au/asxpdf/20260827/pdf/073c04gt4ts40y.pdf","locator":"Development activity (p. 2)","page":2,"plot_url":"https://www.plot.eco/s/NFYF-8G?snippet=846cff06-1d68-4949-8770-e4bd2252c33a"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/EWXK-SG v1, NEXTDC Limited (2025-07-01 to 2026-06-30), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"RZSZ-WS","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/RZSZ-WS","formats":{"html":"https://www.plot.eco/c/RZSZ-WS","json":"https://www.plot.eco/c/RZSZ-WS.json","md":"https://www.plot.eco/c/RZSZ-WS.md","embed":"https://www.plot.eco/c/RZSZ-WS/embed"}},"record_type":"observation","statement":"NEXTDC said expansion works at M3 were on schedule in FY26, and that the M3 lease commenced during the year.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Facility status","value":{"text":"Expansion works under way (FY26)","number":null,"lower":null,"upper":null,"comparator":"not_applicable","unit":null},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2025-07-01 to 2026-06-30","start":"2025-07-01","end":"2026-06-30"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The company's full-year results release","uncertainty":null,"limitations":"Company-reported.","explanation":null,"source":{"title":"FY26 Record Results and Record FY27 Growth Guidance (ASX release, 27 August 2026)","publisher":"NEXTDC Limited","url":"https://announcements.asx.com.au/asxpdf/20260827/pdf/073c04gt4ts40y.pdf","locator":"FY27 guidance (p. 4)","page":4,"plot_url":"https://www.plot.eco/s/NFYF-8G?snippet=95cf3b2c-68d3-4be4-a254-9aff99417788"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/RZSZ-WS v1, NEXTDC Limited (2025-07-01 to 2026-06-30), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"9KEW-EB","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/9KEW-EB","formats":{"html":"https://www.plot.eco/c/9KEW-EB","json":"https://www.plot.eco/c/9KEW-EB.json","md":"https://www.plot.eco/c/9KEW-EB.md","embed":"https://www.plot.eco/c/9KEW-EB/embed"}},"record_type":"observation","statement":"NEXTDC said in August 2021 that it had received formal planning consent to build M3.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Planning consent status","value":{"text":"Formal planning consent received, as NEXTDC reported","number":null,"lower":null,"upper":null,"comparator":"not_applicable","unit":null},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"? to 2021-08-12","start":null,"end":"2021-08-12"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"historic","method":"The company's own news release","uncertainty":null,"limitations":"Company-reported; the permit itself (who issued it, its conditions) has not been found.","explanation":null,"source":{"title":"It's all systems go Victoria: NEXTDC unveils plans for 150MW hyperscale campus in Melbourne's west","publisher":"NEXTDC Ltd","url":"https://www.nextdc.com/news/its-all-systems-go-victoria-nextdc-unveils-plans-150mw-hyperscale-campus-melbournes-west","locator":"News release, 12 Aug 2021","page":null,"plot_url":"https://www.plot.eco/s/B29Z-J1?snippet=20e30151-df8d-482d-abc5-3829188d652b"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/9KEW-EB v1, NEXTDC Ltd (? to 2021-08-12), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"HDD8-KX","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/HDD8-KX","formats":{"html":"https://www.plot.eco/c/HDD8-KX","json":"https://www.plot.eco/c/HDD8-KX.json","md":"https://www.plot.eco/c/HDD8-KX.md","embed":"https://www.plot.eco/c/HDD8-KX/embed"}},"record_type":"relationship","statement":"NEXTDC says its M3 Melbourne data centre is located in West Footscray, about 10 km from the Melbourne CBD.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":{"id":"92MT-9W","name":"West Footscray","url":"https://www.plot.eco/e/92MT-9W"},"measure":"located_in","value":null,"caveats":{"kind":"reported_association","kind_label":"Reported association","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"undated","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":null,"method":null,"uncertainty":null,"limitations":null,"explanation":null,"source":{"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","locator":"M3 page, opening paragraph","page":null,"plot_url":"https://www.plot.eco/s/VND3-CR?snippet=088c58e4-8917-42c0-9265-91aceb355cbd"},"framework_targets":[],"editions":["ala-additions-2"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":{"found":"before_protocol","summary":"Found before PLOT's sourcing protocol v0.1 existed. Extracted with claude-opus-5-5, prompt journey_gap@1; a person reviewed it before publication.","protocol":null,"note":"Step 7 journey gaps: link claims proposed by AI (prompt journey_gap@1) from snippets of sources already on the record; each needs a person's review.","question":null,"channel":null,"query":null,"screening":null,"extraction":{"prompt_ref":"journey_gap@1","model_ref":"claude-opus-5-5"}},"jobs":null,"cite_as":"PLOT record c/HDD8-KX v1, NEXTDC (undated), reported association"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"TC0Z-ER","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/TC0Z-ER","formats":{"html":"https://www.plot.eco/c/TC0Z-ER","json":"https://www.plot.eco/c/TC0Z-ER.json","md":"https://www.plot.eco/c/TC0Z-ER.md","embed":"https://www.plot.eco/c/TC0Z-ER/embed"}},"record_type":"observation","statement":"NEXTDC says M3 stores at least 24 hours of fuel on site for its backup engines.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"On-site fuel reserve for backup generation","value":{"text":"≥ 24 hours","number":24,"lower":null,"upper":null,"comparator":">=","unit":"hours"},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"Undated page read 22 Oct 2026","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"current_period","method":"The operator's own specification page","uncertainty":null,"limitations":"Company-reported. Fuel volume and type not stated.","explanation":null,"source":{"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","locator":"Specifications: power","page":null,"plot_url":"https://www.plot.eco/s/VND3-CR?snippet=7d2d8d5b-6005-414d-94fb-1b70d7de006b"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/TC0Z-ER v1, NEXTDC (Undated page read 22 Oct 2026), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"Q9BY-Q8","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/Q9BY-Q8","formats":{"html":"https://www.plot.eco/c/Q9BY-Q8","json":"https://www.plot.eco/c/Q9BY-Q8.json","md":"https://www.plot.eco/c/Q9BY-Q8.md","embed":"https://www.plot.eco/c/Q9BY-Q8/embed"}},"record_type":"observation","statement":"NEXTDC says M3 stores at least 24 hours of water on site.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"On-site water reserve","value":{"text":"≥ 24 hours","number":24,"lower":null,"upper":null,"comparator":">=","unit":"hours"},"caveats":{"kind":"source_reported","kind_label":"Reported by source","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"Undated page read 22 Oct 2026","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"current_period","method":"The operator's own specification page","uncertainty":null,"limitations":"Company-reported. Water use is not stated; this is storage.","explanation":null,"source":{"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","locator":"Specifications: cooling","page":null,"plot_url":"https://www.plot.eco/s/VND3-CR?snippet=e6d38a75-e997-4335-a776-1f61b696376b"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/Q9BY-Q8 v1, NEXTDC (Undated page read 22 Oct 2026), reported by source"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"PZP1-PA","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/PZP1-PA","formats":{"html":"https://www.plot.eco/c/PZP1-PA","json":"https://www.plot.eco/c/PZP1-PA.json","md":"https://www.plot.eco/c/PZP1-PA.md","embed":"https://www.plot.eco/c/PZP1-PA/embed"}},"record_type":"observation","statement":"NEXTDC says M3's later construction stages are tracking at approximately 27% lower embodied carbon than the Stage 1 baseline.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Embodied carbon below the project's baseline","value":{"text":"≈ 27 %","number":27,"lower":null,"upper":null,"comparator":"~","unit":"%"},"caveats":{"kind":"modelled_forecast","kind_label":"Modelled or forecast","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"? to 2026-06-30","start":null,"end":"2026-06-30"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"nowcast","method":"The company's embodied-carbon tracking for the project (method not published)","uncertainty":null,"limitations":"An estimate while building, against the company's own baseline; the baseline and method aren't published. Company-reported.","explanation":null,"source":{"title":"NEXTDC Limited FY26 Environmental, Social & Governance Report","publisher":"NEXTDC Limited","url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Environmental%2c%20Social%20%26%20Governance%20Report.pdf","locator":"Chair and CEO message (p. 3)","page":3,"plot_url":"https://www.plot.eco/s/T7WJ-MS?snippet=bef89b06-15d9-4f6b-bf44-1f28041c8462"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/PZP1-PA v1, NEXTDC Limited (? to 2026-06-30), modelled or forecast"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"QR8W-P5","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/QR8W-P5","formats":{"html":"https://www.plot.eco/c/QR8W-P5","json":"https://www.plot.eco/c/QR8W-P5.json","md":"https://www.plot.eco/c/QR8W-P5.md","embed":"https://www.plot.eco/c/QR8W-P5/embed"}},"record_type":"observation","statement":"NEXTDC states a PUE target of 1.29 for M3, as a yearly average.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Power usage effectiveness (PUE) target","value":{"text":"1.29 PUE","number":1.29,"lower":null,"upper":null,"comparator":"=","unit":"PUE"},"caveats":{"kind":"design_target","kind_label":"Target (not achieved performance)","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"Yearly average target; undated page read 22 Oct 2026","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"target","method":"The operator's own specification page","uncertainty":null,"limitations":"A design target, not measured energy use. Company-reported.","explanation":null,"source":{"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","locator":"Specifications: cooling","page":null,"plot_url":"https://www.plot.eco/s/VND3-CR?snippet=23106a2b-b342-4886-b7b5-2c1f51e3803c"},"framework_targets":[],"editions":["nextdc-and-mobil-update"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/QR8W-P5 v1, NEXTDC (Yearly average target; undated page read 22 Oct 2026), target (not achieved performance)"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"1A07-S3","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/1A07-S3","formats":{"html":"https://www.plot.eco/c/1A07-S3","json":"https://www.plot.eco/c/1A07-S3.json","md":"https://www.plot.eco/c/1A07-S3.md","embed":"https://www.plot.eco/c/1A07-S3/embed"}},"record_type":"observation","statement":"NEXTDC's half-year results release said M3's total planned capacity was upgraded from 200 MW to 225 MW.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Planned IT capacity (whole site)","value":{"text":"225 MW","number":225,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"design_target","kind_label":"Target (not achieved performance)","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"2025-07-01 to 2025-12-31","start":"2025-07-01","end":"2025-12-31"},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"target","method":"The company's half-year results release","uncertainty":null,"limitations":"A planned design figure, not power drawn or built. Company-reported.","explanation":null,"source":{"title":"1H26 Record Results (ASX release, 25 February 2026)","publisher":"NEXTDC Limited","url":"https://announcements.asx.com.au/asxpdf/20260225/pdf/06wrhk4xg0qv34.pdf","locator":"Development activity (p. 2)","page":2,"plot_url":"https://www.plot.eco/s/C3BW-F7?snippet=71fbe44a-b882-45bf-8d27-bbfb00b99185"},"framework_targets":[],"editions":["october-26th-release"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/1A07-S3 v1, NEXTDC Limited (2025-07-01 to 2025-12-31), target (not achieved performance)"},{"schema":"plot.claim/v1","address":{"kind":"claim","id":"3BB8-0H","version":1,"latest_version":1,"is_latest":true,"release":null,"url":"https://www.plot.eco/c/3BB8-0H","formats":{"html":"https://www.plot.eco/c/3BB8-0H","json":"https://www.plot.eco/c/3BB8-0H.json","md":"https://www.plot.eco/c/3BB8-0H.md","embed":"https://www.plot.eco/c/3BB8-0H/embed"}},"record_type":"observation","statement":"The operator advertises 225 MW of IT capacity for M3. This is a design figure, not measured electricity use.","about":{"id":"994H-VK","name":"NEXTDC M3 · West Footscray","kind":"facility","url":"https://www.plot.eco/e/994H-VK","place":null},"object":null,"measure":"Advertised IT capacity","value":{"text":"225 MW","number":225,"lower":null,"upper":null,"comparator":"=","unit":"MW"},"caveats":{"kind":"design_target","kind_label":"Target (not achieved performance)","origin":"operator_reported","origin_label":"Reported by the operator","period":{"text":"Undated webpage accessed 13 October 2026","start":null,"end":null},"verification":{"level":"reviewed","label":"Reviewed","step":3,"of":4,"meaning":"PLOT checked the claim against its source. This is not independent verification.","basis":"person","basis_note":"Checked by a person."},"open_questions":{"count":0,"note":"Open questions and challenges are counted publicly; their text is published when they are resolved."}},"temporal_status":"target","method":"Operator-advertised specification, not a measurement","uncertainty":"Actual installed/approved/used capacity not established","limitations":"Not proof of operating electricity demand, annual use, or environmental impact.","explanation":null,"source":{"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","locator":"M3 page / IT Capacity statistic","page":null,"plot_url":"https://www.plot.eco/s/VND3-CR?snippet=0f7e9b81-7882-4382-9001-3101b5048d4d"},"framework_targets":[],"editions":["ala-additions-2"],"history":[{"version":1,"change_reason":null,"current":true}],"resolved_questions":[],"sourcing":null,"jobs":null,"cite_as":"PLOT record c/3BB8-0H v1, NEXTDC (Undated webpage accessed 13 October 2026), target (not achieved performance)"}],"next_steps":[{"id":"6FS2-82","title":"Request a facility-specific water balance","url":"https://www.plot.eco/n/6FS2-82","cite_as":"PLOT record n/6FS2-82 v1, Imported from batch M3 candidate evidence transcription — NOT approved for publication (as of 2026-10-15), proposal"}],"resolved_questions":[],"sensitivity":"public","locations_withheld_in":[],"structure":null,"cite_as":"PLOT record e/994H-VK v1, compiled by PLOT (2021-08-12 to 2026-06-30), facility summary","in_review":0,"evidence_threshold":{"threshold":"sourced","shown":17,"shown_by":{"reviewed":17,"from_approved_sources":0,"not_yet_checked":0},"not_shown":{"from_approved_sources":0,"awaiting_review":0},"label":"Reviewed and from approved sources","line":"17 claims shown, all reviewed."}}