{"schema":"plot.source/v1","address":{"kind":"source","id":"T7WJ-MS","url":"https://www.plot.eco/s/T7WJ-MS","formats":{"html":"https://www.plot.eco/s/T7WJ-MS","json":"https://www.plot.eco/s/T7WJ-MS.json","md":"https://www.plot.eco/s/T7WJ-MS.md"}},"title":"NEXTDC Limited FY26 Environmental, Social & Governance Report","publisher":"NEXTDC Limited","author_type":"company","kind_label":"Source: pdf, company author. A source is where claims come from; it is not itself a claim.","date":null,"edition":null,"licence":null,"reuse_note":"All rights reserved by NEXTDC Limited. PLOT keeps a private copy and shows only short quoted passages with a link to the page.","rights_corrected":null,"access_tier":"open","original_url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Environmental%2c%20Social%20%26%20Governance%20Report.pdf","how_found":"Found before sourcing protocol v0.1 (pre-protocol)","stored":{"retrieved_at":"2026-10-22T00:43:00.711288+00:00","content_sha256":"01a454d4a5fad7ab1b143b53648f19edba4ba4eaa570a16aaae15b17f349ef6b","mime_type":"application/pdf","page_count":41},"page_images":"not_shown_licence","claims_count":8,"snippets":[{"locator_id":"0f2a73e0-da04-4a7f-8764-80059f08786e","locator":"Our data centres and Traditional Custodians (p. 2)","page":2,"pdf_page":null,"quote":"M3 Melbourne D1 Darwin 25 Indwe Street, West Footscray VIC 3012","claims":[{"id":"GEN9-S7","url":"https://www.plot.eco/c/GEN9-S7","statement":"NEXTDC gives M3 Melbourne's address as 25 Indwe Street, West Footscray VIC 3012."}]},{"locator_id":"4c50d14e-9837-40fa-8adc-1b0f0b2f6125","locator":"Chair and CEO message (p. 3)","page":3,"pdf_page":null,"quote":"At M3, subsequent stages are currently tracking at approximately 27% lower embodied carbon than the Stage 1 baseline","claims":[{"id":"PZP1-PA","url":"https://www.plot.eco/c/PZP1-PA","statement":"NEXTDC says M3's later construction stages are tracking at approximately 27% lower embodied carbon than the Stage 1 baseline."}]},{"locator_id":"0fb9550a-4148-4413-8b96-c39f37b590a8","locator":"About this report (p. 4)","page":4,"pdf_page":null,"quote":"Our double Materiality Assessment identified biodiversity as a peripheral topic for NEXTDC","claims":[{"id":"8BTX-BD","url":"https://www.plot.eco/c/8BTX-BD","statement":"NEXTDC's FY26 double materiality assessment identified biodiversity as a peripheral topic for the company."}]},{"locator_id":"aeddcd99-4e76-48e9-abd9-f4514293daa0","locator":"About this report (p. 4)","page":4,"pdf_page":null,"quote":"we have retired our standalone Climate and Nature Report","claims":[{"id":"50ZJ-V8","url":"https://www.plot.eco/c/50ZJ-V8","statement":"In FY26 NEXTDC retired its standalone Climate and Nature Report and is reassessing how it aligns with the TNFD recommendations."}]},{"locator_id":"3c234edd-b880-4468-9d83-4c813573f14c","locator":"About this report (p. 4)","page":4,"pdf_page":null,"quote":"NEXTDC is reassessing how its alignment with the TNFD recommendations and LEAP approach","claims":[{"id":"50ZJ-V8","url":"https://www.plot.eco/c/50ZJ-V8","statement":"In FY26 NEXTDC retired its standalone Climate and Nature Report and is reassessing how it aligns with the TNFD recommendations."}]},{"locator_id":"bef89b06-15d9-4f6b-bf44-1f28041c8462","locator":"FY26 highlights (p. 6)","page":6,"pdf_page":null,"quote":"M3 Stages 2 and 4 are tracking at approximately 27% lower embodied carbon","claims":[{"id":"PZP1-PA","url":"https://www.plot.eco/c/PZP1-PA","statement":"NEXTDC says M3's later construction stages are tracking at approximately 27% lower embodied carbon than the Stage 1 baseline."}]},{"locator_id":"1825b50f-e729-4156-b1e0-3e1e546f4951","locator":"Overview (p. 7)","page":7,"pdf_page":null,"quote":"In FY26, our portfolio PUE was 1.49","claims":[{"id":"6CS3-HT","url":"https://www.plot.eco/c/6CS3-HT","statement":"NEXTDC reports a portfolio power usage effectiveness (PUE) of 1.49 for FY26."}]},{"locator_id":"83dfcbdf-5b6a-45fa-b296-056e0f48f413","locator":"Water stewardship: operational water management (p. 27)","page":27,"pdf_page":null,"quote":"In FY26, NEXTDC consumed approximately 939.70 ML of water across its data centre portfolio","claims":[{"id":"J1FN-DJ","url":"https://www.plot.eco/c/J1FN-DJ","statement":"NEXTDC reports consuming approximately 939.70 ML of water across its data centre portfolio in FY26."}]},{"locator_id":"dec0f1f1-4d9d-4a7e-a417-98e781a58054","locator":"Water stewardship (p. 27)","page":27,"pdf_page":null,"quote":"FY27 priorities include improving metering and digital integration, developing site-level water balances","claims":[{"id":"J1FN-DJ","url":"https://www.plot.eco/c/J1FN-DJ","statement":"NEXTDC reports consuming approximately 939.70 ML of water across its data centre portfolio in FY26."}]},{"locator_id":"d66f0e7b-4c2f-4a6f-bdef-a941a155ea52","locator":"Water stewardship: operational water management (p. 27)","page":27,"pdf_page":null,"quote":"with an average WUE of 2.40","claims":[{"id":"4KT8-WN","url":"https://www.plot.eco/c/4KT8-WN","statement":"NEXTDC reports an average water usage effectiveness (WUE) of 2.40 across its portfolio in FY26."}]},{"locator_id":"7292d3b2-7e31-445e-92c9-22ce5eccec4d","locator":"Waste and circularity (p. 28)","page":28,"pdf_page":null,"quote":"with a cumulative 94.7% diversion from landfill","claims":[{"id":"1HAP-GB","url":"https://www.plot.eco/c/1HAP-GB","statement":"NEXTDC reports a cumulative 94.7% diversion of M3's construction waste from landfill since tracking began in October 2024."}]},{"locator_id":"3596313e-7df1-43cb-b06d-4d2594d53b64","locator":"Waste and circularity (p. 28)","page":28,"pdf_page":null,"quote":"Since waste tracking commenced at M3 in October 2024, approximately 2,684 tonnes of construction waste has been managed","claims":[{"id":"1HAP-GB","url":"https://www.plot.eco/c/1HAP-GB","statement":"NEXTDC reports a cumulative 94.7% diversion of M3's construction waste from landfill since tracking began in October 2024."}]}],"places":[],"sheets":[],"cite_as":"NEXTDC Limited, NEXTDC Limited FY26 Environmental, Social & Governance Report. PLOT source s/T7WJ-MS"}