{"schema":"plot.source/v1","address":{"kind":"source","id":"VND3-CR","url":"https://www.plot.eco/s/VND3-CR","formats":{"html":"https://www.plot.eco/s/VND3-CR","json":"https://www.plot.eco/s/VND3-CR.json","md":"https://www.plot.eco/s/VND3-CR.md"}},"title":"M3 Melbourne: facility specifications","publisher":"NEXTDC","author_type":null,"kind_label":"Source: webpage. A source is where claims come from; it is not itself a claim.","date":null,"edition":null,"licence":"All Rights Reserved","reuse_note":"All rights reserved by NEXTDC. PLOT keeps a private copy and shows only short quoted passages with a link.","rights_corrected":null,"access_tier":null,"original_url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne","how_found":"Found before sourcing protocol v0.1 (pre-protocol)","stored":{"retrieved_at":"2026-10-21T22:45:29.797085+00:00","content_sha256":"29f44d657d6ca6f101319e92b4c5488c8f26862f1592ee819fe7c6ad88e34d78","mime_type":"text/html","page_count":1},"page_images":"not_shown_licence","claims_count":6,"snippets":[{"locator_id":"0f7e9b81-7882-4382-9001-3101b5048d4d","locator":"M3 page / IT Capacity statistic","page":null,"pdf_page":null,"quote":"M3 Melbourne is a 225MW Tier IV certified data centre","claims":[{"id":"3BB8-0H","url":"https://www.plot.eco/c/3BB8-0H","statement":"The operator advertises 225 MW of IT capacity for M3. This is a design figure, not measured electricity use."}]},{"locator_id":"7d2d8d5b-6005-414d-94fb-1b70d7de006b","locator":"Specifications: power","page":null,"pdf_page":null,"quote":"24hours of fuel stored on-site (minimum)","claims":[{"id":"TC0Z-ER","url":"https://www.plot.eco/c/TC0Z-ER","statement":"NEXTDC says M3 stores at least 24 hours of fuel on site for its backup engines."}]},{"locator_id":"23106a2b-b342-4886-b7b5-2c1f51e3803c","locator":"Specifications: cooling","page":null,"pdf_page":null,"quote":"PUE target of 1.29 (yearly average target)","claims":[{"id":"QR8W-P5","url":"https://www.plot.eco/c/QR8W-P5","statement":"NEXTDC states a PUE target of 1.29 for M3, as a yearly average."}]},{"locator_id":"e6d38a75-e997-4335-a776-1f61b696376b","locator":"Specifications: cooling","page":null,"pdf_page":null,"quote":"24 hours of water stored on-site (minimum)","claims":[{"id":"Q9BY-Q8","url":"https://www.plot.eco/c/Q9BY-Q8","statement":"NEXTDC says M3 stores at least 24 hours of water on site."}]},{"locator_id":"088c58e4-8917-42c0-9265-91aceb355cbd","locator":"M3 page, opening paragraph","page":null,"pdf_page":null,"quote":"Located in West Footscray just 10 km from the Melbourne CBD","claims":[{"id":"HDD8-KX","url":"https://www.plot.eco/c/HDD8-KX","statement":"NEXTDC says its M3 Melbourne data centre is located in West Footscray, about 10 km from the Melbourne CBD."}]},{"locator_id":"d7930ed4-fc70-4c3f-a2b9-2f70e38fccf3","locator":"Page introduction","page":null,"pdf_page":null,"quote":"Located in West Footscray just 10 km from the Melbourne CBD, M3 Melbourne is a 225MW Tier IV certified data centre","claims":[{"id":"X12T-AK","url":"https://www.plot.eco/c/X12T-AK","statement":"NEXTDC presents M3 Melbourne in West Footscray as one of its data centres."}]}],"places":[],"sheets":[],"cite_as":"NEXTDC, M3 Melbourne: facility specifications. PLOT source s/VND3-CR"}