PLOT c/PZP1-PA · version 1
NEXTDC says M3's later construction stages are tracking at approximately 27% lower embodied carbon than the Stage 1 baseline.
≈ 27 % Embodied carbon below the project's baseline
- Kind
- Modelled or forecast
- Who said it
- Reported by the operator
- Period
- ? to 2026-06-30
- Checked
- Reviewed (step 3 of 4): PLOT checked the claim against its source. This is not independent verification. Checked by a person.
- Open questions
- None open
Cite as: PLOT record c/PZP1-PA v1, NEXTDC Limited (? to 2026-06-30), modelled or forecast