Data centres, explained

Drafted with AI help (22 Oct 2026); not yet reviewed. Issuer definitions are added only from a stored source.

What's inside

Data centre
A building or campus that houses computers, storage and network equipment, with the power, cooling and backup to keep them running all the time.

How they're built

Embodied carbon
Greenhouse gases from making and building the materials (steel, concrete), as opposed to running the building. A reduction is against the company's own baseline.
Construction waste diversion
The share of construction waste kept out of landfill by weight, as reported by the builder or operator.
Plan
Site selection, design and permits, before construction starts.
Build
Construction, often in stages over several years, while earlier stages operate.
Operate
Running: computers, cooling and backup working, customers moving in.
Refit and re-equip
Replacing equipment and upgrading cooling or power inside the building.
Decommission or reuse
Closing, demolishing or converting the site, and who pays for it.

Built and used capacity

IT capacity
How much electrical power the computer equipment is designed to draw, in megawatts. It's a design figure: not the power actually used.
Planned capacity
The total IT capacity the operator says the whole site is planned for, once every stage is built and fitted out.
Built capacity
IT capacity in halls that are finished and fitted out. Operators define it in their own words; where one does, its definition is shown too.
Capacity in progress
Planned IT capacity in stages being designed or built, not yet ready for customers.
IT demand
The power the computer equipment actually draws, measured over time. Usually well below capacity, and rarely published per site.

MW and MWh

MW (megawatt)
A rate of power: how much electricity can flow at one moment. 1 MW running for an hour is 1 MWh.
MWh (megawatt-hour)
An amount of energy: power over time. Yearly electricity use is counted in MWh.
Electricity used
All the electricity the site draws in a year, measured at its boundary: computers, cooling, lighting and losses together.

PUE

IT-equipment electricity
The part of the site's electricity used by the computer equipment itself. It's the denominator of PUE and WUE.
PUE (power usage effectiveness)
All the site's electricity divided by the IT equipment's electricity. 1.0 would mean nothing is spent on cooling or losses. A target is not a measured result.

Cooling

Cooling
How heat from the computers is taken away: air, chilled water, evaporative cooling towers or liquid cooling. Each uses water and electricity differently.
Heat reuse
Waste heat piped to a neighbour (a pool, homes, a greenhouse) and metered where it's received. Zero until something is connected.

Water

Water withdrawn
All the water a site takes in during a year, from mains, recycled water, rain or bores. A pressure on water supplies, not a measure of nature's condition.
Water consumed
Water taken in and not returned: mostly what evaporates in cooling. Always less than or equal to water withdrawn.
Water stored on site
How much water the tanks hold at once. Storage is not use: a full tank says nothing about how much is drawn in a year.
Water reserve
How long the stored water would last if supply stopped, as the operator states it. It depends on load and weather, so it's a design figure.
Water source
Where the site's water comes from: drinking-water mains, recycled water, rainwater or groundwater.
Waterway condition
The health of the creek or river, measured with the waterway manager's or regulator's own indicators, not a PLOT score.
Reference pool
A PLOT convention for picturing water: a 50 × 25 m pool, 2 m deep, holds 2.5 ML. Converting units never changes what a figure counts.
ML (megalitre)
One million litres.

WUE and reference points

WUE (water usage effectiveness)
Litres of site water per kilowatt-hour of IT electricity. Companies count the water differently (withdrawn or consumed, which uses); compare only like with like.
Published reference point
A figure another operator published for its own boundary (a region, a portfolio). Shown with that boundary, never pooled into a ranking.

Backup power

Fuel reserve
How long stored diesel would run the backup generators in an outage, as the operator states it.
Diesel and generators
Backup generators run in outages and in regular tests. Their fuel, hours, noise and exhaust are pressures to report separately for tests and outages.
Boundary noise
Sound level measured at the nearest homes, in A-weighted decibels, against the applicable limit.

Footprint, floor area and habitat

Native habitat on site
Area of native vegetation or habitat within the site, mapped by an ecologist. Landscaping and lawn are not native habitat.
Gross loss
Habitat removed, counted on its own before any gain. PLOT never shows a net figure without the gross loss and gross gain beside it.
Gross gain
Habitat created or restored, counted on its own. Planting is activity, not proof of recovery.
Mapped building footprint
The outline of the building's roof as volunteers traced it in OpenStreetMap from imagery. Approximate, dated, not surveyed.
Mapped construction area
The area OpenStreetMap shows as under construction, traced from imagery on the date given. Not a building outline.
Floor area
The area of all floors added together. Floor area laid flat is not the building's footprint on the ground: a three-storey hall's floor area is three times its footprint.
Gross floor area (GFA)
All floor area inside the outer walls, every storey added together.
Campus land
The land parcels the site occupies. A parcel is not a building: much of it may be roads, yards or open ground.
MCG playing arena
The Melbourne Cricket Ground's arena, about 174 × 149 m fence to fence. PLOT treats it as an ellipse to give a familiar area; the method is shown.

Who's who

Operator
The organisation that runs the facility day to day.
Developer or applicant
Who applied for the planning permit and is building the project. It may be the operator, or not.
Registered landowner
Who holds title to the land, from the land register. Often different from the operator.
Contractor
A company engaged to build all or part of the project. Responsible for its own site practices.
Planning authority
The body that decides the planning permit: a council or the state, depending on the project.
Regulator
An agency that sets and enforces rules on pollution, water or energy at the site.
Community group
A group of residents or volunteers. Shown as an organisation with its public contact route; individual residents are never profiled.
Traditional Owner organisation
The organisation recognised as speaking for Country here. Shown as organisational context only; no individual is named without their authority and consent.
Public-role profile
A person shown only in a public role (a councillor, a company executive named in its own report), with the source for the role. Not a personal profile.
Nominated representative
Someone an organisation has named as its contact for PLOT. Different from a publicly sourced role: being named in a report doesn't make someone the contact.

Reading a PLOT facility page

Archetype
The kind of facility a page is built for. It decides which measures and questions the page asks; it says nothing about how well the facility does.
Pressure
Something the facility does or draws on that can affect nature, such as water or electricity use. A pressure is not a measure of nature's condition.
Condition
The state of nature itself (habitat extent, waterway health), measured with a stated method.
On the record
At least one claim with its source answers this.
Partly on the record
Something is on the record, but not the measure asked for: a target instead of a result, or one part of the answer.
No record yet
PLOT holds nothing that answers this yet. Missing is never zero.
Reviewed and published
A person checked the claim against its source and published it.
Not reviewed
Proposed for the record but not yet checked by a person. Shown only to staff.
Design or target
What the operator plans or aims for. Not a measured result.
Reported by a source
A figure or statement as a source published it, not checked independently.
Observed
Measured or seen with a stated method.
Modelled or forecast
An estimate from a model or a projection, not a measurement.
What the operator says
From the company that runs the facility. Never independent evidence.
Government reported
From a council, agency or regulator's own publication.
NextStep
The record's current proposal for the most useful next move, with the barrier it clears and who could move it.
Evidence gap
Something PLOT looked for and didn't find, recorded so someone can fill it.
Light spill
Light from the site reaching beyond its boundary, measured in lux against the adopted standard.
Complaints
Complaints received by the operator or regulator, and how long they took to close.
Jobs
Full-time-equivalent construction and operating jobs, and the local share only where it's disclosed.
Scenario arithmetic
Conditional arithmetic from numbers you choose. Not a forecast for this facility.

How a facility could give back to its place: design patterns.