Data centres, explained
Drafted with AI help (22 Oct 2026); not yet reviewed. Issuer definitions are added only from a stored source.
What's inside
- Data centre
- A building or campus that houses computers, storage and network equipment, with the power, cooling and backup to keep them running all the time.
How they're built
- Embodied carbon
- Greenhouse gases from making and building the materials (steel, concrete), as opposed to running the building. A reduction is against the company's own baseline.
- Construction waste diversion
- The share of construction waste kept out of landfill by weight, as reported by the builder or operator.
- Plan
- Site selection, design and permits, before construction starts.
- Build
- Construction, often in stages over several years, while earlier stages operate.
- Operate
- Running: computers, cooling and backup working, customers moving in.
- Refit and re-equip
- Replacing equipment and upgrading cooling or power inside the building.
- Decommission or reuse
- Closing, demolishing or converting the site, and who pays for it.
Built and used capacity
- IT capacity
- How much electrical power the computer equipment is designed to draw, in megawatts. It's a design figure: not the power actually used.
- Planned capacity
- The total IT capacity the operator says the whole site is planned for, once every stage is built and fitted out.
- Built capacity
- IT capacity in halls that are finished and fitted out. Operators define it in their own words; where one does, its definition is shown too.
- Capacity in progress
- Planned IT capacity in stages being designed or built, not yet ready for customers.
- IT demand
- The power the computer equipment actually draws, measured over time. Usually well below capacity, and rarely published per site.
MW and MWh
- MW (megawatt)
- A rate of power: how much electricity can flow at one moment. 1 MW running for an hour is 1 MWh.
- MWh (megawatt-hour)
- An amount of energy: power over time. Yearly electricity use is counted in MWh.
- Electricity used
- All the electricity the site draws in a year, measured at its boundary: computers, cooling, lighting and losses together.
PUE
- IT-equipment electricity
- The part of the site's electricity used by the computer equipment itself. It's the denominator of PUE and WUE.
- PUE (power usage effectiveness)
- All the site's electricity divided by the IT equipment's electricity. 1.0 would mean nothing is spent on cooling or losses. A target is not a measured result.
Cooling
- Cooling
- How heat from the computers is taken away: air, chilled water, evaporative cooling towers or liquid cooling. Each uses water and electricity differently.
- Heat reuse
- Waste heat piped to a neighbour (a pool, homes, a greenhouse) and metered where it's received. Zero until something is connected.
Water
- Water withdrawn
- All the water a site takes in during a year, from mains, recycled water, rain or bores. A pressure on water supplies, not a measure of nature's condition.
- Water consumed
- Water taken in and not returned: mostly what evaporates in cooling. Always less than or equal to water withdrawn.
- Water stored on site
- How much water the tanks hold at once. Storage is not use: a full tank says nothing about how much is drawn in a year.
- Water reserve
- How long the stored water would last if supply stopped, as the operator states it. It depends on load and weather, so it's a design figure.
- Water source
- Where the site's water comes from: drinking-water mains, recycled water, rainwater or groundwater.
- Waterway condition
- The health of the creek or river, measured with the waterway manager's or regulator's own indicators, not a PLOT score.
- Reference pool
- A PLOT convention for picturing water: a 50 × 25 m pool, 2 m deep, holds 2.5 ML. Converting units never changes what a figure counts.
- ML (megalitre)
- One million litres.
WUE and reference points
- WUE (water usage effectiveness)
- Litres of site water per kilowatt-hour of IT electricity. Companies count the water differently (withdrawn or consumed, which uses); compare only like with like.
- Published reference point
- A figure another operator published for its own boundary (a region, a portfolio). Shown with that boundary, never pooled into a ranking.
Backup power
- Fuel reserve
- How long stored diesel would run the backup generators in an outage, as the operator states it.
- Diesel and generators
- Backup generators run in outages and in regular tests. Their fuel, hours, noise and exhaust are pressures to report separately for tests and outages.
- Boundary noise
- Sound level measured at the nearest homes, in A-weighted decibels, against the applicable limit.
Footprint, floor area and habitat
- Native habitat on site
- Area of native vegetation or habitat within the site, mapped by an ecologist. Landscaping and lawn are not native habitat.
- Gross loss
- Habitat removed, counted on its own before any gain. PLOT never shows a net figure without the gross loss and gross gain beside it.
- Gross gain
- Habitat created or restored, counted on its own. Planting is activity, not proof of recovery.
- Mapped building footprint
- The outline of the building's roof as volunteers traced it in OpenStreetMap from imagery. Approximate, dated, not surveyed.
- Mapped construction area
- The area OpenStreetMap shows as under construction, traced from imagery on the date given. Not a building outline.
- Floor area
- The area of all floors added together. Floor area laid flat is not the building's footprint on the ground: a three-storey hall's floor area is three times its footprint.
- Gross floor area (GFA)
- All floor area inside the outer walls, every storey added together.
- Campus land
- The land parcels the site occupies. A parcel is not a building: much of it may be roads, yards or open ground.
- MCG playing arena
- The Melbourne Cricket Ground's arena, about 174 × 149 m fence to fence. PLOT treats it as an ellipse to give a familiar area; the method is shown.
Who's who
- Operator
- The organisation that runs the facility day to day.
- Developer or applicant
- Who applied for the planning permit and is building the project. It may be the operator, or not.
- Registered landowner
- Who holds title to the land, from the land register. Often different from the operator.
- Contractor
- A company engaged to build all or part of the project. Responsible for its own site practices.
- Planning authority
- The body that decides the planning permit: a council or the state, depending on the project.
- Regulator
- An agency that sets and enforces rules on pollution, water or energy at the site.
- Community group
- A group of residents or volunteers. Shown as an organisation with its public contact route; individual residents are never profiled.
- Traditional Owner organisation
- The organisation recognised as speaking for Country here. Shown as organisational context only; no individual is named without their authority and consent.
- Public-role profile
- A person shown only in a public role (a councillor, a company executive named in its own report), with the source for the role. Not a personal profile.
- Nominated representative
- Someone an organisation has named as its contact for PLOT. Different from a publicly sourced role: being named in a report doesn't make someone the contact.
- Public professional reference
- A link to where the person or organisation describes the role publicly. Confirmed (a named source links it), or a likely match. Not identity verification.
Reading a PLOT facility page
- Archetype
- The kind of facility a page is built for. It decides which measures and questions the page asks; it says nothing about how well the facility does.
- Pressure
- Something the facility does or draws on that can affect nature, such as water or electricity use. A pressure is not a measure of nature's condition.
- Condition
- The state of nature itself (habitat extent, waterway health), measured with a stated method.
- On the record
- At least one claim with its source answers this.
- Partly on the record
- Something is on the record, but not the measure asked for: a target instead of a result, or one part of the answer.
- No record yet
- PLOT holds nothing that answers this yet. Missing is never zero.
- Reviewed and published
- A person checked the claim against its source and published it.
- Not reviewed
- Proposed for the record but not yet checked by a person. Shown only to staff.
- Design or target
- What the operator plans or aims for. Not a measured result.
- Reported by a source
- A figure or statement as a source published it, not checked independently.
- Observed
- Measured or seen with a stated method.
- Modelled or forecast
- An estimate from a model or a projection, not a measurement.
- What the operator says
- From the company that runs the facility. Never independent evidence.
- Government reported
- From a council, agency or regulator's own publication.
- NextStep
- The record's current proposal for the most useful next move, with the barrier it clears and who could move it.
- Evidence gap
- Something PLOT looked for and didn't find, recorded so someone can fill it.
- Light spill
- Light from the site reaching beyond its boundary, measured in lux against the adopted standard.
- Complaints
- Complaints received by the operator or regulator, and how long they took to close.
- Jobs
- Full-time-equivalent construction and operating jobs, and the local share only where it's disclosed.
- Scenario arithmetic
- Conditional arithmetic from numbers you choose. Not a forecast for this facility.
How a facility could give back to its place: design patterns.